you are here: Home / News / Industry News / Water pipe fittings installed

Water pipe fittings installed

Update:30-01-2018
Summary:

Prior to this, need to understand the composition of th […]

Prior to this, need to understand the composition of the original. The main components of the water pipe fittings include: Elbow, Reducing Elbow, Elbow, Tee, Reducing Tee, Inner Fitting, Reducing Inner Fitting, Filament Fitting, Inner Filament Filling, Cap, plug, live joints and so on. If the choice is PPR pipe, welded with a hot melt machine on it; if the use of iron pipe, you need to use the threading machine threading, and then use the twine hemp or raw material belt.
1) When installing, it is best to understand the usefulness and advantages of different types of plumbing fittings with suitable raw materials.
2) Note that the installation location, buried in the wall of the water pipe can not have joints.
3) When the pipe fittings, the first shut off the valve, connected, open for testing.
4) When installing the connector, it should be aligned, can not make the connector loose, which will lead to leakage at the connector, once the welding is finished, then remove it is very troublesome. Owners do not have the confidence to install, you can ask a special decoration staff to operate, so as to avoid problems after the joint is not good to deal with.

http://www.heshungardentools.com/

Copyright © 2016 Cixi heshun plastic electric appliance co.,ltd All rights reserved. Design by HWAQ